Goal Semiconductor Promises Shortest Lead-times for FLASH 8051 MCUs

Montreal (PRWEB) November 3, 2004

While many of today’s FLASH 8051 microcontroller manufacturers offer lead-times of 12 to 30 weeks, Goal Semiconductor can deliver its low-cost 8051s from stock to 4 weeks.

 

Drop-in replacement

 

Goal’s VERSA Microcontroller Families of cost-effective, FLASH 8051-based microcontrollers are pin-to-pin/drop-in replacements for industry standard MCUs. “Goal Semiconductor anticipated the industry-wide lead-time problem and, therefore, invested in both inventory and short-turnaround capacity. As a result, we are in a position to supply the most commonly used 3.3 and 5 Volt 8051 microcontrollers in 4 weeks or less, at a competitive price”, says Goal VP of Sales John Zambakkides.

 

Some of Goal’s popular FLASH densities, available in PLCC-44, QFP-44 and DIP-40:

 

8051MCUs


About The Author

Ibrar Ayyub

I am an experienced technical writer holding a Master's degree in computer science from BZU Multan, Pakistan University. With a background spanning various industries, particularly in home automation and engineering, I have honed my skills in crafting clear and concise content. Proficient in leveraging infographics and diagrams, I strive to simplify complex concepts for readers. My strength lies in thorough research and presenting information in a structured and logical format.

Follow Us:
LinkedinTwitter

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top